Introduction to ASAP Methodology
AcceleratedSAP methodology is proven, repeatable and successful approach to implement SAP solutions across industries and customer environments.
It provides content, tools and expertise from thousands of successful implementations.
Phase 1: Project Preparation :
During this phase the team goes through initial planning and preparation for SAP project.
Define project goals and objectives
Clarify the scope of implementation
Define project schedule, budget plan, and implementation sequence
Establish the project organization and relevant committees and assign resources
Phase 2: Business Blueprint
The purpose of this phase is to achieve a common understanding of how the company intends to run SAP to support their business. Also, to refine the original project goals and objectives and revise the overall project schedule in this phase. The result is the Business Blueprint, a detailed documentation of the results gathered during requirements workshops.
Phase 3: Realization:
The purpose of this phase is to implement all the business process requirements based on the Business Blueprint. The system configuration methodology is provided in two work packages: Baseline (major scope); and Final configuration (remaining scope). Other key focal areas of this phase are conducting integration tests and drawing up end user documentation.
Phase 4: Final Preparation:
The purpose of this phase is to complete the final preparation (including testing, end user training, system management and cutover activities) to finalize your readiness to go live. The Final Preparation phase also serves to resolve all critical open issues. On successful completion of this phase, you are ready to run your business in your live SAP System.
Phase 5: Go Live & Support:The purpose of this phase is to move from a project-oriented, pre-production environment to live production operation. The most important elements include setting up production support, monitoring system transactions, and optimizing overall system performance.
Web-Links for SAP Project Management, ASAP Methodology & Solution Manager
AcceleratedSAP methodology is proven, repeatable and successful approach to implement SAP solutions across industries and customer environments.
It provides content, tools and expertise from thousands of successful implementations.
Phase 1: Project Preparation :
During this phase the team goes through initial planning and preparation for SAP project.
Define project goals and objectives
Clarify the scope of implementation
Define project schedule, budget plan, and implementation sequence
Establish the project organization and relevant committees and assign resources
Phase 2: Business Blueprint
The purpose of this phase is to achieve a common understanding of how the company intends to run SAP to support their business. Also, to refine the original project goals and objectives and revise the overall project schedule in this phase. The result is the Business Blueprint, a detailed documentation of the results gathered during requirements workshops.
Phase 3: Realization:
The purpose of this phase is to implement all the business process requirements based on the Business Blueprint. The system configuration methodology is provided in two work packages: Baseline (major scope); and Final configuration (remaining scope). Other key focal areas of this phase are conducting integration tests and drawing up end user documentation.
Phase 4: Final Preparation:
The purpose of this phase is to complete the final preparation (including testing, end user training, system management and cutover activities) to finalize your readiness to go live. The Final Preparation phase also serves to resolve all critical open issues. On successful completion of this phase, you are ready to run your business in your live SAP System.
Phase 5: Go Live & Support:The purpose of this phase is to move from a project-oriented, pre-production environment to live production operation. The most important elements include setting up production support, monitoring system transactions, and optimizing overall system performance.
Web-Links for SAP Project Management, ASAP Methodology & Solution Manager
- ASAP Roadmap SAP Helphttp://help.sap.com/saphelp_47x200/helpdata/en/48/623972d55a11d2bbf700105a5e5b3c/content.htm
- ASAP Methodology & ASAP Roadmap - Requires OSS LoginSAP Service Marketplace http://service.sap.com/asap &http://service.sap.com/roadmaps
- Overview of the ASAP methodology Richard W. Vawter, University of Southern California
- http://www-rcf.usc.edu/~anthonyb/itp320/ASAP.ppt
- Implementing SAP R/3 in 21st Century: Methodology and Case Studies Dr. Arzu Baloğlu. Marmara University. www.tojet.net/e-book/SAPBook.pdf
- Implementing SAP R/3 - Book Review Presentations UNIVERSITY OF KENTUCKY
- http://www.uky.edu/IT/AdminApps/IRISTechPortal/Presentations/Presentations.htm
- SAP Project implementation: Example Project Blueprint & Project CharterUniversity of Tennessee
- http://iris.tennessee.edu/sap_project.htm
ASAP Methodology
ASAP stands for Accelerated SAP methodology which is used to implement and deliver the project efficiently.
The five stages of ASAP methodologies are-
Project plan, Business Blue print, Realization, Final preparation & Go-Live - support.
1. Project Preparation: In this phase the system landscape will be set up.
2. Business Blueprint: It is a detailed documentation of your company's requirements. (I.e. what are the objects we need to develop are modified depending on the client's requirements).
3. Realization: In this only, the implementation of the project takes place (development of objects etc)
And we are involved in the project from here only.
4. Final Preparation: Final preparation before going live i.e. testing, conducting pre-go-live, end user training etc.
End user training is given that is in the client site you train them how to work with the new environment, as they are new to the technology.
5. Go-Live & support: The project has gone live and it is into production. The Project team will be supporting the end users.
The BW ASAP Methodology Implementation Project phases:
1.Project Preparation / Requirement Gathering
2 Business Blueprint
3 Realization
4 Final Preparation
5 GO Live & Support
1. Project Preparation / Requirement Gathering:
Collect requirement thru interviews with Business teams /Core users / Information Leaders.
Study& analyze KPI’s (key figures) of Business process.
Identify the measurement criteria's (Characteristics).
Understand the Drill down requirements if any.
Understand the Business process data flow if any.
Identify the needs for data staging layers in BW – (i.e need for ODS if any)
Understand the system landscape.
Prepare Final Requirements Documents in the form of Functional Specifications containing:
Report Owners,
Data flow,
KPI’s,
Measurement criteria’s,
Report format along with drilldown requirements.
2. Business Blueprint:
Check Business content against the requirements
Check for appropriate
Info Objects - Key figures & Characters
Check for Info cubes / ODS
Check for data sources & identify fields in source system
Identify Master data
Document all the information in a file – follow standard templates
Prepare final solution
Identify differences (Gaps) between Business Content & Functional
Specification, Propose new solutions/Developments & changes if required at different levels such as Info Objects, Info cube, Data source etc. Document the gaps& respective solutions proposed– follow standard templates
Design& Documentation
Design the ERD & MDM diagrams for each cube & related objects
Design the primary keys/data fields for intermediate Storage in ODS
Design the Data flow charts right from data source up to Cube .
Consider the performance parameters while designing data models
Prepare High level / Low level design documents for each data model. --- follow standard templates
Identify the Roles & Authorizations required and Document it – follow standard templates
Final review of design with core BW users.
Sign off the BBP documents
In this phase you create a blueprint using the Question & Answer database (Q&Adb), which documents your enterprise’s requirements and establishes how your business processes and organizational structure are to be represented in the SAP System. You also refine the original project goals and objectives and revise the overall project schedule in this phase.
Functional requirements should cover minimum of the below check list
Business Objectives and Benefits
Business Scope and Events
Business Process Scope
Future state process improvements
Business KPI s
Reporting Requirements
System/Client Strategy Interface Requirements
Source System Mapping
Field availability (Master data + Transaction data)
Transformation details
Data availability frequency
Data availability type
System availability and Outage window
Data load dependencies
History Data Load availability
Data Volume
Data Reconciliation
Data retention
Contingency Planning
Authorizations
Transport Strategy
Capacity /Resource Planning
Gap Analysis
Integration and Policy/SOX consideration
Support– Service Level support /Production support
Change Management
Technical requirements - Take a BI report ,translate functional requirements in to technical design.
Map KF, Characteristics, Free Char, RKF,CKF
3. Realization
Check& Apply Latest Patches/Packages ...in BW & R/3 systems.
Activate/Build& enhance the cubes/ODS as per data model designs...maintain the version documents.
Identify& activate Info objects / Master data info sources / attributes ,prepare update rules
Assign data sources .prepare transfer rules , prepare multi providers . prepare Info packages .
Perform the unit testing for data loads….both for master data & transaction data .
develop& test the end user queries .
Design the process chains ,schedule & test
create authorizations / Roles …assign to users ..and test
Apply necessary patches & Notes if any .
freeze& release the final objects to quality systems
perform quality tests .
Re design if required . (document changes, maintain versions)
4. Final Preparations:
Prepare the final check list of objects to be released .identify the dependencies & sequence of release
Perform Go Live checks as recommended by SAP in production system
Keep up to date Patch Levels in Production system
Test for production scenarios in a pre-production system which is a replica of production system.
Do not encourage the changes at this stage.
Freeze the objects.
5. GO Live & Support:
Keep up to date Patch Levels
Release the objects to production system
Run the set ups in R/3 source system & Initialize Loads in BW
Schedule Batch jobs in R/3 system (Delta loads)
Schedule the process chains in BW.
Performance tuning – on going activity
Enhancements- if any
ankara
ReplyDeletesakarya
tekirdağ
kastamonu
amasya
MQ5
https://titandijital.com.tr/
ReplyDeletenevşehir parça eşya taşıma
bolu parça eşya taşıma
batman parça eşya taşıma
bayburt parça eşya taşıma
QKZV
trabzon evden eve nakliyat
ReplyDeletebursa evden eve nakliyat
ordu evden eve nakliyat
erzurum evden eve nakliyat
mardin evden eve nakliyat
0LS
urfa evden eve nakliyat
ReplyDeletemalatya evden eve nakliyat
burdur evden eve nakliyat
kırıkkale evden eve nakliyat
kars evden eve nakliyat
WZWY3X
A68BF
ReplyDeleteEryaman Parke Ustası
Kütahya Lojistik
Muğla Parça Eşya Taşıma
Van Evden Eve Nakliyat
Karaman Parça Eşya Taşıma
Manisa Şehirler Arası Nakliyat
Kütahya Parça Eşya Taşıma
Tokat Evden Eve Nakliyat
Sakarya Lojistik
9F02F
ReplyDeleteSivas Şehir İçi Nakliyat
Kayseri Şehir İçi Nakliyat
Mersin Evden Eve Nakliyat
Mersin Şehirler Arası Nakliyat
Erzincan Lojistik
Kocaeli Evden Eve Nakliyat
Adıyaman Lojistik
İzmir Şehir İçi Nakliyat
Edirne Şehir İçi Nakliyat
E933F
ReplyDeleteChat Gpt Coin Hangi Borsada
Bitmart Güvenilir mi
Bibox Güvenilir mi
Afyon Şehirler Arası Nakliyat
Amasya Lojistik
Zonguldak Şehirler Arası Nakliyat
Bone Coin Hangi Borsada
Btcst Coin Hangi Borsada
Kars Şehirler Arası Nakliyat
4B792
ReplyDeleteBursa Şehir İçi Nakliyat
Bingöl Şehir İçi Nakliyat
Diyarbakır Şehirler Arası Nakliyat
Van Şehirler Arası Nakliyat
Erzurum Parça Eşya Taşıma
Ankara Fayans Ustası
Giresun Evden Eve Nakliyat
Rize Lojistik
Gümüşhane Evden Eve Nakliyat
5CE75
ReplyDeletehalotestin for sale
Samsun Şehirler Arası Nakliyat
Çankaya Boya Ustası
Adıyaman Evden Eve Nakliyat
Poloniex Güvenilir mi
Osmaniye Evden Eve Nakliyat
Karapürçek Boya Ustası
buy turinabol
Osmaniye Şehir İçi Nakliyat
31062
ReplyDeleteBinance Borsası Güvenilir mi
Kripto Para Nasıl Alınır
Coin Üretme
magnet
Kripto Para Kazanma
Coin Oynama
Bitcoin Madenciliği Siteleri
Binance Neden Tercih Edilir
Binance Para Kazanma
A0861
ReplyDeleteurfa sohbet
edirne sesli sohbet sitesi
osmaniye canlı sohbet sitesi
ısparta sesli sohbet uygulamaları
kırklareli yabancı canlı sohbet
van bedava görüntülü sohbet sitesi
maraş ücretsiz sohbet
rastgele görüntülü sohbet
yalova ücretsiz görüntülü sohbet
6B024
ReplyDeleteen az komisyon alan kripto borsası
kripto para nasıl alınır
canli sohbet
probit
kaldıraç ne demek
probit
cointiger
binance referans kod
bybit
41DD3
ReplyDelete4g mobil
kripto telegram
bitcoin nasıl üretilir
kripto para nereden alınır
kripto para nasıl alınır
huobi
kaldıraç ne demek
bitcoin seans saatleri
gate io
33F43
ReplyDeletefiltre kağıdı
probit
kucoin
kucoin
kripto telegram
canlı sohbet odaları
bybit
kaldıraç nasıl yapılır
kripto para nereden alınır
شركة مكافحة حشرات بخميس مشيط diQcq28v5y
ReplyDeleteشركة تنظيف مساجد بالجبيل pjj0wL9RWq
ReplyDeleteشركة مكافحة حشرات kWKTyVWBS6
ReplyDeleteشركة عزل اسطح بالهفوف dTaBgYuEYw
ReplyDelete